
project description:

project advantage:

√low carbon construction: the construction of steel structure residential carbon emissions than the traditional concrete 35%.
√material saving: self weight is smaller than the traditional concrete reduce about 40%.
√water saving: on-site assembly of construction, sewage emissions than the traditional concrete reduced by 60%.
√energy saving: the use of new energy-saving wall materials, heat preservation performance is 3 times of the brick wall.
√land saving: can improve the efficiency of the use of per unit of land area, indoor room rate increased 5~8%.
√the material recovery and regeneration: the main structure material recovery reached more than 90%, waste emissions reduced by about 60% compared with the traditional concrete.
√architectural design standardization: improving design and construction efficiency.
√structure(part) production factory: the factory is accurate, the quality is more secure.
√site construction and assembly:
·green construction, reduce the haze (construction dust than the traditional building to reduce more than 80%);
·shorter construction period 1/3, short payback period of investment;
·engineering quality is easy to control and supervise, effectively avoid the risk of quality and safety;
·the construction workers are transformed into assembly workers, reduce labor intensity and labor intensity.
√civil decoration integration

project application cases:
e-mail:contact@tianfon.com
address:china, xinxiang, high-tech development
zone is a new street, number 369-1